From a single room in a home to airports and everything in between, Mitsubishi Electric is the prime choice for solutions to the toughest project challenges. Explore our case studies to learn more about Mitsubishi Electric products.
Community/Tourism
Community
Mildura Arts Centre
Mitsubishi Electric E-series modular chiller provides a compact and quiet replacement for the Mildura Arts Centre.
Community
Brimbank Aquatic & Wellness Centre
First indoor aquatic centre in Australia to achieve a Six-Star Green Star Design score and the first to go all-electric for pool heating.
Tourism
Cradle Mountain Visitor Centre
Alpine visitor centre heated by an in screed hydronic underfloor heating using the Mitsubishi Electric Air to Water system using a CITY MULTI PUHY VRF heat pump and PWFY HEX units
Residential
Residential
Geothermal House
Harnessing the geothermal energy of the earth as a heating or cooling energy store with a CITY MULTI water cooled heat recovery (WR2) VRF system.
Medical
Medical
North Lakes Medical Centre
Heat recovery CITY MULTI VRF system utilising M-NET for individual tenancy controlled heating and cooling and indoor unit power isolation for staged tenancy fit out.
Medical
Red Cross Blood Bank
Constant year round air conditioning with 24/7 temperature sensing and control with second unit operating in duty/standby configuration.
Case Study, Medical
Campsie Medical & Dental Centre
Hybrid VRF eliminates need for refrigerant leak detection and alarms and provides comfortable experience for staff and patients.
Education
Education
Charles Campbell College
College with limited power supply uses CITY MULTI VRF peak cut control to deliver an air conditioning system with load shedding.
Office
Office
Floth Sustainable Building Consultants Head Office
Award winning office building using City Multi VRF 2-pipe heat recovery solution. A combination of standard and 100% fresh air ducted indoor units efficiently & quietly delivers comfort to occupants.
Process Cooling
Case Study, Process Cooling
Annandale Dairy Farm
Mitsubishi Electric e-series chiller provides high efficiency process cooling for bulk milk cooling tank, even on seasonal part load.
Apartment
Apartment, Case Study
Skye by Crown
The 20-story Skye by Crown uses Mitsubishi Electric CITY MULTI water cooled heat recovery system with broom closet sized plant rooms on each floor.
Apartment, Case Study
Watermark Premium Apartments
CITY MULTI 2-pipe heat recovery system featuring power monitoring, Zone Control and Wi-Fi Control for complete tenant comfort and accurate energy billing.
Apartment
Laverton MFB – Accommodation
HYBRID CITY MULTI selected for a Metropolitan Fire Brigade station in Melbourne’s west eliminates need for refrigerant leak detection equipment.
Apartment
Kodo Apartments
30 storey Kodo Apartments building in Adelaide uses City Multi R2 series heat recovery VRF with compact plant rooms to maximise residential, retail and communal spaces.
Apartment
115 King William Street Adelaide
Commercial office building in the Adelaide CBD with a 90 m pipe lift height using a Mitsubishi Electric medium pressure sensor kit.
Aged Care
Aged Care, Case Study
Mark Moran Vaucluse
CITYMULTI VRF heat recovery technology providing simultaneous heating and cooling integrated into Building Management and Control System with energy monitoring and management.
Hotel
Hotel
Devonport Waterfront Hotel
Devonport Waterfront Hotel turns to Mitsubishi Electric City Multi Hybrid VRF for simultaneous heating and cooling. Hybrid VRF eliminates the risks of refrigerant leaks in occupied spaces.
Hotel
Rydges Sydney Airport Hotel
CITY MULTI Heat Recovery VRF providing simultaneous heating and cooling, with guest control of their own comfort, backed by a system with advanced environmental monitoring and control.
Hotel
Rydges Palmerston Hotel
Water cooled CITY MULTI VRF system selected for the constant hot and humid conditions in Darwin, does not require ventilation or external cooling.
Hotel
Peppers Silo Hotel
CITY MULTI air cooled 2-pipe heat recovery VRF system providing simultaneous heating and cooling for a unique luxury hotel from a redeveloped former grain silo site.
Hotel
Next Hotel Brisbane
Renovated hotel upgrades air conditioning system to Mitsubishi Electric 2-pipe heat recovery water cooled CITY MULTI VRF utilising existing chilled water system.
Hotel
Abode Hotel Woden
Abode Woden Hotel is a prime example of adaptive reuse of a former Government office building converted into a stylish hotel. The Canberra development was awarded with a 4.5 star NABERS Energy rating utilising CITY MULTY heat recovery technology.
Case Study, Hotel
Sofitel Hotel Adelaide
i-FX Air Cooled Chiller with Inverter screw compressors provides cooling for the new Sofitel Hotel in Adelaide, in one of the tallest developments in South Australia.
Infrastructure
Infrastructure
Nagoya Works ICONICS GENESIS64 Journey
Mitsubishi Electric Nagoya Works used ICONICS GENESIS64™ SCADA software to streamline energy infrastructure management. Real-time visualisation and remote access improved efficiency, reducing downtime and enabling remote work during COVID-19. It saved costs and positions the software for future sustainability goals.
Infrastructure
Autocesta Zagreb-Macelj Ltd.
Working with system integrator LED Elektronika Ltd., the Autocesta Zagreb-Macelj Ltd., part of a highway network in the Republic of Croatia located in the European traffic corridor connecting Croatian motorways with European motorway networks, was able to enhance the existing PrecisionX SCADA system on top of the ICONICS GENESIS64 SCADA.
Infrastructure
Meir Tunnel
Meir, a suburb in Stoke-on-Trent, Staffordshire, is home to a 284-meter-long road tunnel on the A50, a major trunk road running almost 100 miles from Warrington to Leicester. The heavily congested district connects Uttoxeter, Nottingham and the East Midlands with Stoke-on-Trent and the M6 Motorway, the UK’s longest, possibly busiest, non-stop motorway.
Infrastructure
Rome Metro S.p.A.
Needing to facilitate expansion of the already large metro, including three lines and 34 stations, Rome Metro S.p.A. looked to ICONICS HMI/SCADA software to enable monitoring and controlling of the entire Metro from a centralized location.
Infrastructure
Scottish Water
Scottish Water provides clean, safe and high quality drinking water to 2.45 million households and 154,000 business premises across Scotland. Every day, they provide 1.3 billion litres of clear, fresh drinking water and take away 842 million litres of waste water, which they treat before returning to the environment.
Infrastructure
Xi’an Xianyang International Airport
Located in Xi’an, the geographic center of China, Xianyang International Airport (XXIA) is not only the biggest transportation hub in Northwest China, but is also China’s eighth largest airport. XXIA covers over 5.5 square kilometers of land. With a total area of 360,000 square meters, Xi’an Xianyang can handle over 30 million passengers per year.
Infrastructure
Attiki Odos Motorway
Attiki Odos Motorway, one of Europe’s most modern motorways, began searching for HMI/SCADA software that monitors air quality within tunnels. ICONICS software allows exterior airflow to keep tunnels clear of carbon dioxide, smoke and nitrogen oxide.
Industrial
Industrial
World Wide Fittings
Illinois-based manufacturer World Wide Fittings (WWF) supplier of steel and stainless hydraulic fittings for end users in construction, agriculture, and heavy equipment, identified the need to improve efficiency within their production processes. WWF automated some repetitive processes with the aid of a Mitsubishi Electric robot, freeing up staff to work on more complicated processes.
Industrial
Tefal SAS
The high cost of energy in the manufacturing process led French manufacturer Tefal SAS, to implement ICONICS software suite. The solution handles data from multiple meters, transformers, disparate PLCs and manufacturing data. With its new ICONICS energy management solution, Tefal was now able to automatically accumulate energy consumption by equipment, area and site. The ICONICs software allows Tefal to obtain the insights they need to reduce energy consumption.
Industrial
PGT Industries
PGT, a pioneer manufacturer of impact resistant window and door industry, implemented ICONICS Productivity Analytics software ahead of a planned investment in capital. The software applied to critical production assets to analyze the Overall Equipment Effectiveness (OEE) of the current plant generated insight into improvements in efficiency.
Industrial
IPSUMM
IPSUMM, a multi-divisional product development company, engineered a work cell using a Mitsubishi Electric 6-axis robot, capable of Quick switching among diverse manufacturing tasks, easy to reconfigure manufacturing capacity and scalable to reduce capital investment demands.
Industrial
Hayley Manufacturing
Hayley Manufacturing partnered with Mitsubishi Electric Automation to develop an innovative packing solution using Mitsubishi Electric six-axis robots. The system inserts cardboard top pads into produce boxes, enhancing productivity and reducing reliance on manual labour. This innovation promises long-term adaptability and reliability compared to traditional mechanical inserters.