Office
St Kilda Road Towers
Mitsubishi Electric City Multi 2-pipe Heat Recovery VRF delivers simultaneous heating and cooling with centralised control for the St Kilda Road Towers HVAC upgrade.
Heat recovery CITY MULTI VRF system utilising M-NET for individual tenancy controlled heating and cooling and indoor unit power isolation for staged tenancy fit out.
Project Info
The Team
North Lakes Specialist Medical Centre, located in one of the fastest growing master planned communities in South East Queensland. The modern architecturally designed building features four levels, and is home to a range of specialist and ancillary medical services providing much needed support, with a focus on Preventative Cardiology and Metabolic Disease, to the local community.
The Centre required individually controlled heating and cooling for multiple tenants including state of the art medical suites. Some parts of the building would require heating while other spaces would require cooling at the same time.
The newly constructed building would require staged fit out as new tenants move in. Air conditioning indoor units located in unoccupied spaces would need to be unpowered until required.
Mitsubishi Electric City Multi 2-pipe heat recovery technology was selected, providing simultaneous heating and cooling for multiple indoor units connected to a single outdoor unit. The 2-pipe system, unique to Mitsubishi Electric, uses a central branch controller and delivers substantial installation savings over conventional 3-pipe heat recovery systems due to the reduced amount of copper refrigerant piping required, particularly on a larger site.
Independent temperature control per tenancy is provided by M-NET, the integrated communications control transmission network unique to Mitsubishi Electric. Power to the indoor units in unoccupied tenancies was isolated also via M-NET, while other indoor units continued to operate.
This enables a staged tenancy fit out and ongoing refurbishments to occur without effecting neighbouring tenancies connected to the same outdoor unit.
Heat Recovery
Heat Pump
Heat Pump
Ceiling Concealed
City Multi VRF Air Conditioning Systems
Office
Mitsubishi Electric City Multi 2-pipe Heat Recovery VRF delivers simultaneous heating and cooling with centralised control for the St Kilda Road Towers HVAC upgrade.
Apartment
Mitsubishi Electric City Multi Hybrid VRF enables staged delivery and heat recovery comfort for The Yarra build-to-rent development.
Community/Tourism
First indoor aquatic centre in Australia to achieve a Six-Star Green Star Design score and the first to go all-electric for pool heating.