Aged Care
Lilliane Brady Village Cobar
City Multi Hybrid VRF upgrade delivering quiet, individually controlled comfort in an operational regional aged care facility while integrating with an existing central control system.
A premium aged care project using Mitsubishi Electric City Multi two-pipe heat recovery VRF to deliver efficient, independent climate control across apartments, common areas, and care facilities.
Project Info
The Team
Balancing Comfort, Efficiency and Resident Autonomy
When the Bert Newton Retirement Village opened its doors in Highett, Victoria, the goal was clear: deliver dignified, luxurious living for over 250 residents across a mixed care model — and do so sustainably.
This multi-stage development comprises 209 residential units, including 85 independent living apartments, 45 serviced apartments, and a 79-bed care centre. Alongside these shared amenities, such as a café, bar, pool, and cinema, support the village’s community ethos.
As with many contemporary aged care and retirement projects, the HVAC design needed to balance comfort, efficiency, and independence while navigating tight construction constraints.
Comfort Zones
A key challenge was ensuring individual thermal control within apartments while still meeting overall site energy goals. Independent living demands independent control, but managing this at scale — across more than 200 residences — is no small task.
The design also needed to support heat recovery for improved energy efficiency, not just in apartments, but in high-use common spaces such as the cinema, salon, bar, and sitting areas. Additionally, the site required heat pump systems in circulation zones, including common hallways.
Constrained riser space further complicated matters, restricting the refrigerant pipework layout. And finally, accurate power apportioning was required so each apartment could be fairly billed for HVAC use.
Two Pipes, One Outcome
To meet the performance requirements within spatial limits, a two-pipe heat recovery VRF system was installed. This approach reduced the piping required to fit within the limited pipe risers. The VRF system enabled simultaneous heating and cooling across most of the site.
High-wall mounted indoor units were selected for master bedrooms and living spaces, offering intuitive, localised control for each resident. These units delivered efficient performance and tenant autonomy, both of which are essential in a residential aged care environment.
Using Mitsubishi Electric multi-port branch controllers, made possible by the two-pipe configuration, meant just three manholes were required per floor instead of 15 from an alternative brand’s branch controllers, significantly reducing associated building costs.
The hallway spaces were serviced by heat pump systems, ensuring that circulation areas remained at required temperatures.
Smart Power, Seamless Exit
The project also addressed a common issue in multi-dwelling HVAC design: fault triggering when individual tenants switch off their systems. In other systems, this risk is typically managed by installing additional “multi-tenant cards” to prevent the system from registering a fault when one unit powers down.
The City Multi VRF system from Mitsubishi Electric offered a distinct advantage. The systems are designed to remain stable even when tenants turn off their own units. This design feature removed the need for additional hardware and streamlined the installation process.
“That design saved us a lot of hassle,” says Michael Eade, Director, Contract Air Conditioning. “Other systems often need multi-tenant cards to stop faults when someone switches off their unit. With City Multi, that problem simply didn’t exist, and it gave us one less thing to worry about during commissioning.”
Electrical metering was also carefully planned. Indoor units drew from each apartment’s own power, while central outdoor units were CT metered to apportion shared energy use back to individual residences, enabling accurate tenant billing.
The Mitsubishi Electric City Multi Heat Recovery VRF system is well suited to applications such as nursing homes, where simultaneous heating and cooling is required.
“The design and features of the Mitsubishi Electric City Multi heat recovery VRF were like it was purpose-built for this project,” says Michael Eade. “Eliminating the need for additional apartment cards, using a two-pipe (heat recovery) system to reduce piping and installation costs, accommodating limited pipe risers, and minimising the number of branch boxes required, all contributed to a system that is simpler to install and maintain.”
“The Mitsubishi Electric commissioning team’s knowledge got us over the line, too. We worked together on a staggered commissioning approach that meant residents could move in seamlessly as each stage was completed. Their service support has been excellent when problems arise, though they’ve been minimal,” mentioned Michael.
For large-scale developments like the Bert Newton Retirement Village, the two-pipe heat recovery VRF system from Mitsubishi Electric offers a streamlined solution that meets project goals while delivering meaningful cost savings.
Heat Recovery
Heat Pump
Heat Pump
City Multi VRF Air Conditioning Systems
Ceiling Concealed
Ceiling Concealed
Wall Mounted
Wall Mounted
Ceiling Cassette
Ceiling Cassette
Centralised Air Conditioning Controllers
Air Conditioning Wall Controllers
Aged Care
City Multi Hybrid VRF upgrade delivering quiet, individually controlled comfort in an operational regional aged care facility while integrating with an existing central control system.
Office
Mitsubishi Electric City Multi 2-pipe Heat Recovery VRF delivers simultaneous heating and cooling with centralised control for the St Kilda Road Towers HVAC upgrade.
Apartment
Mitsubishi Electric City Multi Hybrid VRF enables staged delivery and heat recovery comfort for The Yarra build-to-rent development.