St Kilda Road Towers
Mitsubishi Electric City Multi 2-pipe Heat Recovery VRF delivers simultaneous heating and cooling with centralised control for the St Kilda Road Towers HVAC upgrade.
Mitsubishi Electric City Multi water cooled heat recovery VRF provides 3.0 MW of integrated heating, cooling and ventilation for high-density mixed-use Queensbridge Building in Southbank.
Project Info
The Team
Located at 88 Queens Bridge Street in Southbank, Victoria, The Queensbridge Building is a high-density mixed-use development. Positioned within Melbourne’s Southbank precinct, the development comprises a large residential apartment tower integrated with hotel accommodation. Designed to maximise vertical density within a constrained CBD-adjacent footprint, the project required careful coordination among the architectural, structural, and building services disciplines.
Given its scale and mixed-use configuration, the mechanical services strategy needed to support diverse occupancy patterns, varying internal loads and independent comfort requirements across hundreds of dwellings. The project presented a complex high-rise services brief, forming the foundation for a fully integrated HVAC solution tailored to premium residential and hotel operations.
The Queensbridge Building at 88 Queens Bridge Street featured a complex mechanical services brief typical of high-density mixed-use towers in Melbourne’s CBD fringe. The development combines a large residential apartment tower and hotel accommodation within a limited vertical footprint, requiring a highly coordinated and scalable HVAC solution.
Traditional plant-room-installed condensers were not viable due to architectural constraints. Roof space was limited, and proximity to neighbouring towers heightened the importance of noise management and controlled heat rejection. The system needed to avoid excessive rooftop equipment while maintaining performance across hundreds of independently controlled zones.
Beyond heating and cooling, the mechanical strategy also required heat recovery ventilation for the hotel. Each room needed to manage bathroom exhaust and tempered make-up air while complying with energy efficiency targets. The solution, therefore, had to integrate distributed sensible heat recovery ventilation within the ceiling space of individual hotel rooms without compromising spatial planning or acoustic performance.
Controls integration was equally critical. With more than 800 indoor units serving apartments, hotel areas and penthouse residences, the project required a controls strategy that maintained operational separation between each building component while preserving individual occupant temperature control. Independent control systems were provided for the hotel, apartments and penthouses, allowing each area to be monitored and managed separately. The challenge was to deliver a water-loop heat-recovery architecture capable of supporting simultaneous heating and cooling, integrated ventilation, and multiple dedicated control platforms within a premium high-rise development.
To address the spatial and coordination constraints of the Queensbridge Building, a centralised condenser water loop was deployed to support Mitsubishi Electric City Multi water cooled heat recovery VRF systems. While a rooftop plantroom was incorporated within the building design, available space was limited, requiring a mechanical strategy that could distribute plant throughout the tower rather than concentrating equipment in a single location.
A total of 76 PQRY-P-YLM-A1 water cooled heat recovery outdoor modules were installed across the development, delivering over 3.0 MW of cooling capacity. Rather than requiring large dedicated plantrooms on each mechanical level, the water cooled outdoor units were located within purpose-built service cupboards positioned in common corridors on the respective floors.
This installation approach was possible because Mitsubishi Electric water cooled condensers incorporate an internal fan and do not require ventilation openings to dissipate heat. As a result, the condenser units can operate within enclosed service cupboards without the need for additional ventilation infrastructure.
Distributing condensers within floor-level service cupboards reduced reliance on centralised plant areas and significantly improved spatial efficiency within the tower. By avoiding the need for additional mechanical plantrooms, valuable floor area could instead be allocated to residential apartments and hotel accommodation — an important consideration in a high-density urban development where maximising usable space directly supports project value.
Across the development, more than 870 indoor air conditioning units were integrated via a branch controller architecture. The system incorporates a mix of compact ceiling concealed, ducted and wall-mounted indoor units, selected to suit apartment layouts and hotel areas. This distributed configuration provides independent temperature control at the apartment level while maintaining system-wide load diversity and operational flexibility.
The system is also capable of operating individual indoor units independently when required. This ensures occupants can maintain comfort even during low-load periods or when only a single apartment requires conditioning — an important operational consideration in residential towers where occupancy patterns vary throughout the day and night.
Ventilation was provided using Mitsubishi Electric Lossnay VL-220CZGV-E sensible core heat recovery units, delivering tempered fresh air to the hotel. These ceiling-mounted units control bathroom exhaust and make-up air while reclaiming sensible energy from exhaust streams, supporting energy efficiency goals and enhancing indoor air quality while reducing the load on the VRF system.
The controls architecture was designed to accommodate the differing operational needs of the apartments, penthouses, and hotel. Mitsubishi Electric centralised controllers provide monitoring, fault reporting, and system management for residential components, while more than 600 wired room controllers allow occupants to adjust conditions in their own spaces. For the hotel, the HVAC system interfaces with the operator’s own controllers via PAC-US445CN-1 interface cards, enabling integration with the hotel’s existing management systems. This approach delivers appropriate visibility and control for each part of the development while maintaining a consistent occupant experience.
The City Multi system also supports energy apportioning for the residential apartments in the development. By monitoring energy consumption at the apartment level, the system provides facilities management with the data required to allocate HVAC energy usage to individual residences. This capability supports transparent energy reporting and simplifies the process of apportioning operating costs across a large multi-residential development.
The completed mechanical services platform delivers a high-performance, fully integrated HVAC solution aligned with the operational demands of a premium high-rise development. By adopting a central condenser water loop and water cooled heat recovery VRF architecture, the project achieved high-density comfort control while reducing the footprint required for equipment, freeing up valuable floor space.
The simplified two-pipe heat recovery design reduced system complexity during construction and lowered both material and labour requirements compared with conventional three-pipe heat recovery installations, enabling efficient installation across multiple floors. Combined with the compact outdoor unit configuration, this helped streamline mechanical services coordination within the constrained plant areas typical of high-rise towers.
By distributing the water cooled outdoor units within dedicated service cupboards rather than central plantrooms, the system minimised the building’s mechanical footprint. This allowed valuable floor area to be retained for apartments and hotel accommodation, supporting the commercial objectives of a high-density urban development.
Residents and hotel occupants benefit from independent temperature control within their own spaces, supported by simultaneous heating and cooling capability across the tower. Internal heat recovery between zones reduces overall energy demand while maintaining comfort under varying load conditions driven by orientation, occupancy and seasonal change.
For building management, the residential control systems provide monitoring, fault reporting, and energy management capabilities, while apartment-level energy apportionment supports the accurate allocation of HVAC operating costs. This provides valuable visibility into system performance and simplifies energy reporting across a large residential development. Fault diagnostics and performance oversight can be managed efficiently, while individual wired controllers preserve occupant autonomy at apartment level.
The result is a scalable, energy-efficient mechanical solution that supports long-term asset performance and resident comfort. With approximately 3.0 MW of installed water cooled heat recovery capacity, more than 870 indoor units and 190 heat recovery ventilation units, the Queensbridge Building stands as a flagship-scale City Multi deployment within Melbourne’s Southbank precinct.
Heat Recovery
Heat Pump
Outdoor Air Conditioning Units
Ceiling Concealed
Ceiling Concealed
Wall Mounted
Wall Mounted
City Multi VRF Air Conditioning Systems
Centralised Air Conditioning Controllers
Lossnay Ventilation
Air Conditioning Wall Controllers
Office
Mitsubishi Electric City Multi 2-pipe Heat Recovery VRF delivers simultaneous heating and cooling with centralised control for the St Kilda Road Towers HVAC upgrade.
Apartment
Mitsubishi Electric City Multi Hybrid VRF enables staged delivery and heat recovery comfort for The Yarra build-to-rent development.
Apartment
Mitsubishi Electric E-Series modular air-sourced heat pumps deliver a fully electric condenser water loop for the Eighty-Eight O’Connell mixed-use towers.